Добро пожаловать на наш сайт!
Jianlong SCBC has recently won the bid for the 300 t/h ultra‑high‑temperature & ultra‑high‑pressure corner‑tube boiler project at Sinopec Jinling Branch’s heating center. As China’s first boiler of this specification, it marks the official adoption of domestic high‑parameter corner‑tube boiler technology in core energy‑supply facilities of major state‑owned petrochemical enterprises.
Petrochemical production features frequent load swings, repeated start‑stop operations and long continuous‑running cycles. Conventional boilers commonly suffer slow regulation, concentrated thermal stress and sealing deterioration. For Sinopec Jinling Branch with lengthy process chains and complex working conditions, any instability in its heating system will directly disrupt safe operation of downstream production units.
Tailored for harsh petrochemical operating conditions, this boiler delivers outstanding performance across four key dimensions:
Structure: Its self‑supporting corner‑tube design forms an integral load‑bearing frame with membrane water‑cooled walls and corner downcomers, eliminating the need for external steel frames and refractory brickwork. Free expansion of heating surfaces ensures even thermal‑stress distribution and prevents deformation under sustained high‑temperature, high‑pressure service.
Regulation: Flexible start‑stop and fast load response enable stable long‑cycle operation amid changing process conditions.
Energy Efficiency: Optimized heat‑exchange design improves thermal efficiency, reduces flue‑gas heat loss and cuts fuel consumption.
O&M: Compact layout saves floor space, shortens installation time, lowers failure rates and reduces overall operation and maintenance costs.
Being the first‑of‑its‑kind unit both nationwide and within the Sinopec group, the project requires item‑by‑item validation with the customer on design schemes, manufacturing processes and inspection criteria without existing reference cases, posing high requirements for technical strength and management capabilities.
This bid win brings Jianlong SCBC into Sinopec’s high‑end core‑equipment supply chain and fills the application gap for large‑tonnage high‑parameter corner‑tube boilers in Sinopec. It will create a replicable engineering benchmark for petrochemical plants nationwide and accelerate the large‑scale roll‑out of domestic corner‑tube boiler technologies.

This achievement builds on years of technical accumulation. Specializing in R&D and manufacturing of high‑end & special high‑parameter industrial boilers, Jianlong SCBC has supplied equipment for well‑known petrochemical complexes including Zhenhai, Hainan, Qilu and Gulei Refining & Chemical.
Going forward, Jianlong SCBC will strictly manage the full workflow from design and manufacturing to delivery. We aim to build a benchmark project proven for long‑term service and support the green, low‑carbon transition of the petrochemical sector with reliable equipment.